Commission 0 - Direct Developer
Promotional Prices - New Building
DESCRIPTION:
Modern and avant-garde, the Residential Complex represents a premium opportunity in the southern area of Bucharest. Located near the Titan Metro and the 1 Decembrie 1918 Metro within the radius of the sector, 3.la only 7 minutes by car.
In the vicinity, means of transport, shopping centers, schools, kindergartens, medical centers as well as recreational spaces.
This building is the ideal combination of quality and durability of construction. Modern architectural design, premium finishes and amenities. High quality materials, practical partitioning with generous indoor and outdoor spaces and easy to arrange, all this to ensure maximized comfort.
ARCHITECTURE:
The special architecture provides a module surrounded by green spaces, the ideal choice for those looking for modern and affordable apartments, with gardens and spacious terraces ranging from 1 to 4 rooms.
The residential complex has an impressive height regime S+P+10E+11Er, and each location has been carefully designed to offer the greatest possible space and comfort.
LOCATION:
The access is made directly from a main street. Located in the immediate vicinity of the Lidl store and the Auchan Titan shopping center, as well as other shopping centers of maximum interest. The location is ideal with many parks and playgrounds for children, doctors' offices, supermarkets, schools and kindergartens, centers for recreational activities.
POSITIONING:
• 1 minute Titan Shopping Center (Auchan Titan, Lidl, World Class)
• 7 minutes away from M Titan and M 1 December 1918
• 8 minutes to Park Lake Mall and IOR Park
• 10 Palalady Shopping Center (Auchan, Ikea, Jumbo, Dechatlon)
• 12 minute Mega Mall
BENEFITS:
• Strategic location of the Metro
• Access to means of transport
• New building
• Experienced developer
• Block heating plant
• Underground parking
•Surveillance
•Intercom
• Internet and television RDS & RCS
UTILITIES:
Connected to all utilities
•sewerage
•water
•gas
•Electricity
AVAILABILITY:
The project will be completed at the end of 2025, with a large part of the housing units already sold.

